
|
Software Development >>
|
|
Svam's solutions are robust, scalable and will easily integrate with a diverse range of products
and technologies. Svam's expertise spans the entire gamut of application and custom development.
At Svam, its wide range of technological expertise, application knowledge and consulting
experience, enable it to develop and integrate robust and scalable e-business solutions that
keep end customer's requirement in mind. The software development process, supported by a
proven onsite-offshore development methodology and quality management system, shortens application
development timeframes, providing significant business benefits to customers.
|
 |
 |
The Software Solutions provided by Svam comprise:
- Client Server Technology
- Web Solutions
- Turnkey Projects
- Microsoft.NET Practice
- Linux/Open Source Practice
- Content Management Solutions - Zope, Vignette
- Workflow Management Solutions
- Migration
- Re-engineering services
At Svam proven expertise and experience is backed by world-class engagement and development
methodologies.
The methodology used for Enterprise Software Solutions includes:
1). Scoping
The scoping phase of the process primarily involves the identification of the client enterprise
requirements and the identification and isolation of exact scope of the development effort.
This involves the following activities:
- Requirements input from client
- Requirements Research
- Effort Estimation for Scoping
- Identification of Roles and Responsibilities
- Preparation & Presentation of Technical/Customer Scoping Proposal
- Signing of Scoping Contract
- User Requirements Study
- Project Estimation
- Technical Project Proposal & Plan
- Project Contract Signing
2). Study & Analysis
The Study and Analysis part of the development process involves elaborate study and analysis
of client requirements identified in the User Requirements Study. At Svam, professionals listen
to client ideas, explore concerns, and contemplate all aspects of the problem - from underlying
business processes to importance of change management to merits of various technologies - to craft
unique information systems that move enterprise business forward and yield a measurable return on
investment.
The study and analysis involves:
- System Study
- User Interface Design
- SRS Preparation
- SRS Internal Review and Approval
- SRS Presentation
- Project Contract Review, Revision and Sign Off
- Preparation of Manuals
3). Design
The design phase involves defining fundamental software architecture for their application as well
as making correct technology choices based on client requirements.
Important activities involve:
-
Preparation of Architectural Design Document
- Final Database Structure
- Data Dictionary
- ER Diagrams
-
Detailed Design Document
- Standards, Design, Coding Documentation
- Program Specification
4). Implementation
The Implementation phase involves the actual coding and development of the application keeping
in mind the architectural design and technology being used.
This includes:
- Coding
- Code Review
- Unit Testing
- User/Help Manual Preparation
5). Testing
Svam adheres to international quality standards for building, testing, and implementation and
conducts a multitude of quality adherence procedures and processes to ensure that the end
product is nothing less than the best expected by the client.
This includes:
- Integration Testing
- System Testing
- Deliverables Verification
- User Acceptance Testing
- Alpha Release
- Beta Release
6). Installation
Following the full release of the application, Svam consultants provide full back-up support
in actual installation and during the running-in period.
The installation services usually involve:
- Final Release
- End User Training
- Warranty Period Changes
- Project Closure
|
|
|
|
|
Methodology
Mindware
Project Management
Hardware & Networking
|
|
We are one of the leading providers of visual content to a diverse range of
professional users of images.
|
|
We are Nationwide Distributor for many of scienticfic, academic & geographical softwares.
|
|
Data Processing & management covers all the steps that are needed to convert data into
electronic form.
|
|
|
|